X

05 As subcontractor

April 05, 2009 by Metalab Admin

As Subcontractor suppliers of digitally fabricated building components we design and organize fabrication, assembly and delivery of integrated parts of projects directly to contractors and clients that require a high degree of unique specialization.


06 Approach image 2

April 05, 2009 by Metalab Admin

a2


07 Brace

April 05, 2009 by Metalab Admin

metabracket1


08 As construction managers…

April 05, 2009 by Metalab Admin

As Construction Managers we are able to connect to our local array of capable fabricators and subcontractors and direct the specific requirements of special projects such as civic art and unique buildings and structures.

09 Approach img 3

April 05, 2009 by Metalab Admin

a3


10 We offer to perform…

April 05, 2009 by Metalab Admin

We offer to perform all or any of these services on a project based on the situation.

Architecture_8000_mirebeauB-C

April 04, 2009 by Metalab Admin

   


Architecture_8300_roundPen-A

April 04, 2009 by Metalab Admin

metabracket1

Architecture_8300_roundPen-C

April 04, 2009 by Metalab Admin

   


Architecture_8000_mirebeauB-B

April 04, 2009 by Metalab Admin

MIRABEAU B The MIRABEAU B SALES CENTER is a temporary structure installed on the site of a proposed LEED Certified, 14-unit Condominium to be built by a Green developer in Houston. It is built from a kit-of-parts composed of two recycled 20’ shipping containers and a series of digitally designed and fabricated components that provide solar racking, shading, signage and exterior decking. With a marketing and communications firm specializing in renewable energy, we developed the Sales Center to serve as visual promotion of the project, real estate agent’s office, material sample display and as a public interpretive center for sustainable architecture. The containers and their components are truly portable so the Center will be up-cycled after its job as a Sales Center is complete. Their role as prefab offices with integrated solar panels and minimal site impact will be carried forward beyond their initial purpose. AIA Houston Design Award 2009 "Citation for Sustainability"


Page 31 of 38 ‹ First  < 29 30 31 32 33 >  Last ›