Assembly Day 1
Memory Cloud installation is well underway at TAMU MSC. We offloaded Monday morning, assembled and test lifted by noon and had the raceway system installed by the end of the day. TyART did the heavy lifting with us.
Memory Cloud installation is well underway at TAMU MSC. We offloaded Monday morning, assembled and test lifted by noon and had the raceway system installed by the end of the day. TyART did the heavy lifting with us.