November 23, 2009 by Metalab Admin
All components have been formed and the "tail" section bolts together in 45 minutes.
Newer entry:Wayne Dolcefino of 13 Undercover gets wet at Open Channel Flow
Older entry:AIA Houston 2009 Design Awards